Skip to content
Category 01/06

Public utility buildings

Public investments requiring precision, large-format glass and work with special profiles.

3 projects
  • Bydgoszcz 2025–2026, in stages

    Opera Nova — Bydgoszcz

    The expansion of Opera Nova is funded by the Kuyavian-Pomeranian Voivodeship, with financial contribution from the City of Bydgoszcz. Construction delivered together with Budimex. Installation of 2000 m² of aluminium-glass façades in a mullion-transom system. Use of 6-metre tall glass panels (first time in Poland) and new aluminium profiles. Total construction cost approximately PLN 150 million.

    Area
    2000 m²
    Duration
    2025–2026, in stages
    General contractor
    Budimex
    Investor
    Kuyavian-Pomeranian Voivodeship
  • Bydgoszcz

    Bydgoszcz University of Science and Technology — Sports Hall

    Installation of a mullion-transom façade for the sports hall of the Bydgoszcz University of Science and Technology, together with glazing — approximately 500 m² in total.

    Area
    ok. 500 m²
  • Szczęsne multi-stage project

    School — Szczęsne

    Installation of façades, doors, windows and internal structures of the school in Szczęsne. Total area approximately 450 m². Project delivered in several stages.

    Area
    ok. 450 m²
    Duration
    multi-stage project
Skopiowano